Basement Update – Wet bar

During the flooring stint we also put up the backsplash tile behind the wet bar. After New Year’s I finished it up with caulk and the necessary touch up paint. The glass mosiac tile, motar, and grout were left over from the kitchen so this was a virtual freebie. So what’ll it be, shaken or stirred?

Tags:

Leave a Reply