Basement Update


Seriously tired of everything to do with drywall. Happy to report, however, that the second coat is complete. I’ve applied 35 gallons of mud at this point – probably 34.5 gallons to the walls and ceiling and a half gallon to my lungs and digestive track.

Tags:

Leave a Reply