Ok, so the project is in its 20th month. Damn, that’s a long time.

At this point ALL of the drywall is hung and we’re closing in on having it all taped (maybe one more week). I need to tally how many sheets it took, but it was plenty more than I expected. We just ordered the cabinents and countertop for the wet bar. That stuff really adds up – nearly $700 for just a couple cabinents and about 7 foot of Formica countertop. That order will be ready in about two weeks so we really need to step it up. None the less I’m betting the cabinents sit in the garage for a couple weeks.

Things are looking good though, maybe better than I expected. I’ll post some pics soon.

Coming up…more taping, more mudding, more sanding, then primer!